Short Lead Time for Construction Pole - Utility Pole – Tunghsing
Short Lead Time for Construction Pole - Utility Pole – Tunghsing Detail:
In the early days the overhead power cable mainly relied on wooden pole as the main material. As timber resources got scarce and difficult to obtain due to the protection by each country, concrete pole became an alternative. However, concrete pole is too heavy, not convenient to install and easy to be corroded by sandy wind, American and some European advanced countries pioneered using the FRP power pole as the replacement in attribute to its excellent properties of lightweight, good physical properties and anti-corrosion. Nowadays FRP power pole has been adopted as the choice of power transmission lines in most of the modern countries.
Originated from Taiwan, Shanghai Tunghsing Composites Co. Ltd. inherited the parent company for decades of FRP pole production experience, and later to carry forward and further advance in our China factory. Shanghai Tunghsing Composites benefits from our core technical team with determination and devotion to offer quality, long lasting and high strength FRP pole at competitive price.
Please find our standard utility pole class in below table. We can also customize according to your specific requirements, please contact us for further information.
Pole Class | Breaking Load (pounds) |
Working Load (pounds) |
Pole Height (ft) |
H6 | 7410 | 3705 | 35、40 |
H5 | 6500 | 3250 | 35、40 |
H4 | 5655 | 2828 | 35、40 |
H3 | 4875 | 2438 | 35、40 |
H2 | 4160 | 2080 | 30、35、40 |
H1 | 3510 | 1755 | 20、30、35、40 |
1 | 2925 | 1463 | 20、30、35、40 |
2 | 2405 | 1203 | 20、30、35、40 |
3 | 1950 | 975 | 20、30、35、40 |
4 | 1560 | 780 | 20、30、35、40 |
5 | 1235 | 618 | 25、30 |
6 | 975 | 488 | 25、30 |
Reference: | |||
1. ANSI O5.1.2008 Annex B | |||
2. Tables 253-1 and 261-1A, NESC (2007 National Electric Safety Code) |
Product detail pictures:
Related Product Guide:
Wind Turbine Components Market – : Present Scenario and the Growth Prospects 2016 – 2024 | 33kv Power Pole
Man walks away unharmed after energized electrical wire falls on his hood near busy South Hill intersection | Fiberglass Plastic Rods
"Quality to start with, Honesty as base, Sincere company and mutual profit" is our idea, as a way to build constantly and pursue the excellence for Short Lead Time for Construction Pole - Utility Pole – Tunghsing, The product will supply to all over the world, such as: luzern , Guatemala , Riyadh , We have been persisting in the business essence "Quality First, Honoring Contracts and Standing by Reputations, providing customers with satisfying goods and service. " Friends both at home and abroad are warmly welcome to establish everlasting business relations with us.
By Juliet from Latvia - 2015.12.10 19:03
This is a honest and trustworthy company, technology and equipment are very advanced and the prodduct is very adequate, there is no worry in the suppliment.
By Hedy from Maldives - 2015.08.12 12:27